QuoteReady Trades

Home › Calculators

Fence calculator

Enter the run length, post spacing and picket size. You get the posts, rails, pickets (with waste), bags of concrete and a material total if you add prices.

The run

Pickets and concrete

Your prices (optional)

How the fence math works

  1. Sections = fence length ÷ post spacing, rounded up. Posts = sections + 1, plus any extra corner or gate posts you enter.
  2. Rails = total rail length (fence length × rails per section) ÷ the length you buy, rounded up. The last section can be shorter than the spacing; buying by total length avoids over-counting that bay.
  3. Pickets = (length − gate width) in inches ÷ (picket width + gap), rounded up, then add waste.
  4. Concrete = posts × bags per post.

Example: a 100 ft privacy fence with posts at 8 ft, three rails, 3½ in pickets and a ½ in gap needs 13 sections, 14 posts, 38 eight-foot rails, 330 pickets at 10% waste, and 28 bags if you use two bags per post. With the default prices that is $1,875 in materials before tax.

Post spacing and extra posts

Eight-foot spacing is common for a 6 ft privacy fence; six-foot spacing is stiffer and is often used for taller fences, high wind, or heavier panels. The post count assumes one straight run. For a yard with corners, add one extra post per corner (the corner post is shared by two runs if you split the job into two lengths, so only add extras when you measure the fence as one total length). Gate posts are also extras if they are heavier or in addition to the line posts.

How many bags of concrete per post?

Two 30 kg (66 lb) bags is a common starting point for a 10 to 12 inch diameter hole, about 2 to 3 ft deep, on a 4×4 or 6×6 post. In much of Canada the frost line is deeper than that, so the hole and the bag count go up. Pre-mix tubes, gravel backfill and “set in crushed stone” methods use little or no bagged concrete — set bags per post to 0 if that is how you set posts. Always follow the local code for depth, diameter and frost protection.

Gates and waste

Enter the total width of the gate openings to take that length off the picket run. Rails and posts are still counted for the full fence length; you will cut rails around the opening and usually use heavier gate posts (add them under extra posts). Ten percent picket waste covers cuts, damaged boards and the odd split; panelized fence systems can use a lower waste factor.

TEMPLATE

Fence Installation Quote Calculator

Put the post, rail, picket and concrete counts into a fence estimate with labour, markups and provincial tax.

See it on Etsy or get all 8 templates in the bundle

FAQ

How many posts do I need for a 100 ft fence?

At 8 ft spacing, a 100 ft straight run is 13 sections and 14 posts (a post at each end and one every 8 ft). Add extra posts for corners and gates.

How many pickets for 100 feet of fence?

With 3½ in pickets and a ½ in gap, each picket covers 4 inches, so a 100 ft run is 300 pickets before waste. Add 10% and order 330. Subtract gate openings before you calculate.

How many bags of concrete per fence post?

Two 30 kg or 66 lb bags is a typical starting point for a standard residential hole. Deeper frost-line holes in Canada often need more. Enter the bag count you actually use per hole.

Does this work for chain-link or panel fence?

The post, rail and concrete counts still apply. For chain-link, set picket width so the picket count is 0 (or ignore the picket line) and count mesh rolls separately. For prefabricated panels, use 1 rail per section or treat each panel as a section and ignore pickets.