Concrete calculator
Enter the length, width and depth of the pour. You get cubic yards and cubic metres, an order quantity rounded up to the next quarter yard, and the number of bags if you mix it yourself.
Bag yield: check your bag. 0.0141 m³ is a common yield for a 30 kg bag of concrete mix.
The concrete formula
Volume in cubic feet = length (ft) × width (ft) × thickness (in) ÷ 12. Divide by 27 to get cubic yards, or multiply cubic yards by 0.7646 to get cubic metres.
Example: a 24 × 22 ft garage pad poured 5 inches thick is 220 cu ft, or 8.15 cubic yards (6.23 m³). With 8% over-pour that becomes 8.8 yards, so you would order 9 yards.
Why add over-pour
Subgrade is never perfectly flat, forms bow a little, and some concrete stays in the truck, the pump and the wheelbarrow. Most contractors add a few percent to as much as 10% depending on the site. Running short mid-pour is far more expensive than a little extra, because a second short load usually carries a fee and can leave a cold joint.
Ready-mix or bags?
For small jobs such as post footings, a step or a small pad, bagged mix is practical. Past roughly a cubic yard the bag count climbs quickly: at 0.0141 m³ per bag, one cubic yard is about 55 bags. For slabs and driveways, ready-mix is usually faster and more consistent. Many suppliers charge a short-load fee on small truck orders, so ask when you book.
Common thicknesses
Walkways and patios are often poured around 4 inches, and garage floors and driveways thicker. Required thickness, reinforcement and base depend on the load, soil and local code, so follow the project specs or your local building requirements rather than a general rule.
Material Takeoff Calculator
The Concrete tab handles several pours at once, adds ready-mix price and delivery fee, and compares against bagged cost, alongside flooring, drywall, paint and framing tabs.
See it on Etsy or get all 8 templates in the bundleFAQ
How many yards of concrete for a 10x10 slab 4 inches thick?
10 × 10 × 4 ÷ 12 = 33.3 cu ft, which is 1.23 cubic yards. With a little over-pour you would order 1.25 to 1.5 yards.
How do I convert cubic yards to cubic metres?
Multiply cubic yards by 0.7646. One cubic metre is about 1.31 cubic yards.
Why is the order rounded to a quarter yard?
Many ready-mix suppliers sell in quarter-yard steps, so the calculator rounds up to the next 0.25 yd after adding over-pour. Check your supplier's minimums.
How many bags is one cubic yard?
At 0.0141 m³ per bag, one cubic yard (0.7646 m³) is about 55 bags. Bag yields differ by product, so enter the yield printed on your bag.